About the project

A complete apartment transformation, from stripping out the original structures to installing a new kitchen. Alongside our own construction work, we coordinated the electricians and joiners so that each trade followed on smoothly and the apartment was handed over to the required standard.

What we did

  • Demolition, removal of furniture and plasterboard structures
  • New floors and electrical wiring
  • Door fitting, painting and kitchen installation
  • Coordinating subcontractors – electrical and joinery work

Key facts

Location
Prague 6 — Podbaba
Project type
Turnkey construction
Space
Apartment
Scope
Demolition, floors, electrics, painting, kitchen
Subcontractors
Electricians, joiners

Approximate location

Photo documentation

Before and after

BEFORE AFTER
Step by step

How the work progressed

How the work progressed – from removing the old kitchen to handing over the apartment. Click a photo to enlarge it.

  1. 1
    Step 1 · Starting point

    Removing the old kitchen

    With the original kitchen gone, the old tiles and worn-out pipes, wiring and outlets were exposed. We documented the space and agreed the work plan with the client.

  2. 2
    Step 2 · Preparation

    Floor protection and demolition

    We covered the parquet in the living area with protective board and tape so the demolition wouldn't damage it. Then we chipped off the remaining wall tiles and removed the old floor tiles in the kitchen area.

  3. 3
    Step 3 · Rough-in work

    New electrical wiring

    We cut chases into the walls and ran new wiring for sockets, appliances and lighting. The outlets are placed exactly to match the new kitchen design.

  4. 4
    Step 4 · Rough-in work

    Filling the wall chases

    Once the new wiring was in, we filled the chases and openings with mortar and repaired damaged areas of the walls, leaving the surface ready for plastering and painting.

  5. 5
    Step 5 · Floors

    Laying large-format floor tiles

    We laid the large-format tiles with a levelling system (the blue wedges), which keeps the tiles perfectly flat and the edges precisely aligned.

  6. 6
    Step 6 · Floors

    Finished tiles in the kitchen area

    The tiles are grouted and meet the original wooden parquet cleanly. The kitchen area is easy to keep clean, while the living area keeps the warmth of wood.

  7. 7
    Step 7 · Finishing work

    Plastering, painting and outlets

    We repaired the walls after the chases, skim-plastered and painted them. The water and electrical outlets are ready exactly where the kitchen will stand.

  8. 8
    Step 8 · Finishing work

    Freshly painted living area

    We finished painting the living area too. Thanks to the protection laid on day one, the original parquet stayed undamaged.

  9. 9
    Step 9 · Handover

    Ready for the kitchen installation

    The space is clean and ready for the joiners. We coordinated the kitchen installation so that it followed on smoothly from our work.

  10. Result

    Kitchen installation and apartment handover

    The kitchen units, worktop and wall tiles were installed onto the prepared outlets and new floor. We handed the apartment over clean and ready to live in. You can see the transformation with the before/after slider above.

Result

Finished kitchen

Back to all references